Lang Road has evolved from a local residential road to one that also provides access to Northwest Park. Over 30,000 individuals visit the park each year. In addition, there have been two sub-divisions: Village Acres and Pheasant Run, which have been developed off of Lang Road that have added to the increase in traffic. The existing pavement surface has deteriorated, there are no drainage structures to handle storm water. The narrow roadway presents a safety hazard to pedestrians and bicyclists. The proposed project would consist of total road reconstruction with a 30 foot wide pavement, curbing, drainage, landscaping, and sidewalk installation, while maintaining the residential character of the neighborhood.
Start Date :
Summer 2008
Completion Date :
Fall 2008
Cost :
$1,500,000
Comments :
This reconstruction is planned from Hitching Post Lane to Northwest Park.