Town Green Improvements


Location: Town Center - 275 Broad St

Town Center - 275 Broad St

The Town Green Improvements project is proposed in order to eliminate safety concerns, improve handicap accessibility, and improve drainage and aesthetics.  This work will include replacing sidewalks and brick on the north-south sidewalk from J. Morrissey to Grace Church, replacing curbing sidewalk and brick along Broad street to Batchelder road, replacing the decorative street lights and placing the wiring in conduit, and repaving the roadway around Eagle Green.

Start Date : June 2008
Completion Date : September 2008
Cost : $155,723
Comments :

Phase 3 is currently under construction by Clover Construction of Bristol Connecticut. The next stage of this work (Phase 4) includes installing curbing, sidewalks, and brick snow shelf from the Eagle Green north driveway along Broad street to the Luddy house. The curbing along Broad Street will be straightened and the sidewalks and brick snow shelf will be replaced, along with installing handicap ramps at the crosswalks. This project is tentatively scheduled for the 2009 construction season, March though October.


« Back