Engineering

Address:
275 Broad Street
Windsor, CT. 06095
Hours:
Mon - Fri
8:00 AM - 5:00 PM
Email:
E-mail Us
Phone:
860-285-1861
Fax:
860-285-1809

Staff

Robert Jarvis, P.E.
Town Engineer
860.285.1804
Victoria Houle, P.E.
Project Engineer
860.285.1862
Jesse English
Engineering Assistant
860.285.1874
Andrew Arnesen
Engineer
860.285.1868
Glenn Cusano
Construction Inspector
860.285.1876

WINDSOR RESIDENTIAL TRANSFER STATION: TRUCK SCALE REMOVAL AND REPLACEMENT - Invitation to Bid

Legal Notice

Town of Windsor

Notice to Contractors

Invitation to Bid – Advertisement

 

Sealed bids for “WINDSOR RESIDENTIAL TRANSFER STATION: TRUCK SCALE REMOVAL AND REPLACEMENT” will be received until 2:00 PM, Thursday, September 28, 2017 in the Finance Office, Town Hall, 275 Broad Street, Windsor, CT.  Contract documents and bid forms can be obtained from the Town of Windsor Engineering Office at the same location for a non-refundable fee of $10.00. 

 

WINDSOR RESIDENTIAL TRANSFER STATION: TRUCK SCALE REMOVAL AND REPLACEMENT consists of the removal of the existing vehicle scale at the Windsor Residential Transfer Station, furnishing and installing a new steel deck vehicle scale with a 50 ton capacity, and provide a temporary scale to be used at the Transfer Station throughout the duration of the project.     

 

The Town of Windsor reserves the right to reject all bids, or to waive any technical defects, and to make an award to the party determined to be the lowest cost, responsive and responsible bidder.

 

For further information, call Mark Goossens, Solid Waste Manager, at 860-285-1832.

 

Windsor is an affirmative action/equal employment opportunity employer.

WBE/MBE/SBE’s and Section 3 Contractors are encouraged to participate.

 

Peter Souza

Town Manager

 

Draft Stormwater Management Plan Available for Review

The Town of Windsor invites you to participate in efforts to clean our community and protect our water resources.  The Engineering Department announces the availability of the Town’s Draft Stormwater Management Plan.  This Draft Plan was developed and is announced in accordance with the Connecticut Department of Energy and Environmental Protection’s (CTDEEP) General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems issued January 20, 2016. 

  

Copies of the Draft Plan are available for review in the Engineering Department office at 275 Broad Street, Windsor, CT, during normal business hours and digitally by clicking the following link: Draft Stormwater Management Plan

 

Comments should be submitted, in writing, by email to DEEP.StormwaterStaff@ct.gov or by mail at the address found below.

 

DEEP

Water Permitting and Enforcement Division

79 Elm Street

Hartford CT 06106

Attn: Karen Allen

About Us

Staff in the Town of Windsor Engineering department develop the Town's infrastructure for non-building related projects in accordance with the Plan of Development and the Capital Improvement Program (CIP).

 

We provide engineering support services to design roads and sidewalks, prepare and update engineering maps and drawings, and serve internal needs as well as those of the general public.